3PE anti-corrosion steel pipe base materials include seamless steel pipes, spiral steel pipes, and straight seam steel pipes. The three-layer polyethylene (3PE) anti-corrosion coating has been widely used in the water supply, natural gas, and petroleum pipeline industries due to its excellent corrosion resistance, water vapor permeability, and mechanical properties.
Description:
3PE anti-corrosion coating production line means the steel pipe is
protected by three layer to prolong the life of use from 5-10years
to 50-100years.
First layer is Fusion bonded epoxy layer (FBE> 100µm), the
second layer of adhesive (AD) 170 ~ 250µm, the third layer of
polyethylene (PE) 2.5 ~ 3.7mm. Present we can made the machinery
for diameter range Φ159 ~ Φ1220.
3PE steel pipe outer coating has a high mechanical strength,
excellent electrical insulation performance. The merits include
high degree of mechanization, process parameters stable, not
pollute the environment, etc. In recent years, the intensive of the
pipeline corrosion engineering has been widely used.
Specific process description:
The bare pipe to be produced is lifted by a crane to the bare pipe
entry platform, and the surface is cleaned of sediment and dirt,
and the welds are inspected for defects. After passing the
preliminary inspection, the bare pipe to be shot blasted and
derusted is transported to the central axis of the spiral conveyor
roller by a hydraulic transverse pipe transport truck, and the
steel pipe is dropped onto the conveyor roller. Under the drive of
the power wheel of the transmission roller, the steel pipe rotates
and moves forward in a straight direction with its head and tail
connected.
Under the conveying of the rust removal conveyor, the steel pipe
enters the cleaning room of the outer wall shot blasting rust
removal machine after intermediate frequency preheating. When the
impeller of the shot blasting machine rotates at high speed, the
abrasive (steel shot+multi edge sand mixture) is ejected onto the
outer surface of the steel pipe under the action of large
centrifugal force. The oxide scale and rust layer on the outer
surface of the steel pipe are cleaned under the impact of abrasive
jet, achieving the surface cleanliness specified by the coating
standard. Simultaneously obtaining a certain depth of anchor
pattern to enhance the adhesion of the coating.
No. | Name | Set |
A. Derusting Equipment | ||
1 | Pipe-converying Equipment | 1 |
2 | Shot Blast Cleaning Machine | 1 |
3 | Cyclone Dust Collector | 1 |
4 | Pulse dust collector | 1 |
5 | Centrifugal exhaust fan | 1 |
6 | Rust removal equipment PLC | 1 |
B. Coating equipment | ||
1 | Coating transfer equipment | 1 |
2 | IF heating device | 1 |
3 | Powder spraying device | 1 |
4 | Automatic loading dryer | 2 |
5 | SJ-65/30 Extruder | 1 |
6 | SJ-180/30 Extruder | 1 |
7 | Hot melt adhesive extruder die | 1 |
8 | PE sheet extruder head mold | 1 |
9 | Hot melt adhesive/PE sheet coating device | 1 |
10 | Environmental Protection Ventilation equipment | 1 |
11 | Cooling Spray equipment | 1 |
C.Platform Equipment | ||
1 | Steel pipe platform | 1 |
2 | Post-rust removal transition platform | 1 |
3 | Product tube storage platform | 1 |
4 | Hydraulic Equipment | 3 |
D.Groove Equipment | ||
1 | PE Beveling Machine | 2 |
2 | Hydraulic Lifting and Turning Machinery | 1 |
3 | Hydraulic Equipment | 1 |
4 | PLC | 1 |
E.Compressed air Equipment | ||
1 | Screw Air Compressor | 1 |
2 | Cold dry machine | 1 |
3 | Precision filters | 3 |
4 | Gas tanks | 1 |